Troffer, High Bay, Strip & HID-to-LED Conversion Kits — Pricing, DLC Rebates & Installation Comparison
| Kit Type | Replaces | Wholesale Price (ea) | MOQ | DLC Listed? | Install Time/Fixture |
|---|---|---|---|---|---|
| 2x4 Troffer Retrofit | Fluorescent T8/T12 troffers | $18-40 | 50-200 | ✅ 150+ DLC models | 10-15 min |
| 2x2 Troffer Retrofit | Fluorescent U-bend troffers | $15-35 | 50-200 | ✅ 80+ DLC models | 8-12 min |
| HID-to-LED High Bay (150W eq) | 400W metal halide high bay | $35-75 | 20-100 | ✅ 200+ DLC models | 15-25 min |
| HID-to-LED High Bay (240W eq) | 750-1000W MH high bay | $55-110 | 20-100 | ✅ 120+ DLC models | 20-30 min |
| Magnetic Strip-to-Linear LED | T12 magnetic strip (8ft/4ft) | $12-28 (4ft) | 50-200 | ✅ 100+ DLC models | 8-12 min |
| LED Corn Bulb (screw-in) | HID mogul-base bulbs | $8-25 | 50-500 | ⚠️ Limited DLC | 2-5 min |
| Downlight Retrofit (4"/6"/8") | CFL downlight cans | $5-15 | 100-500 | ✅ 300+ DLC models | 3-5 min |
100-fixture project, 2x4 troffer office building:
| Cost Factor | Retrofit Kit ($28/ea avg) | Full Replacement ($40/ea fixture) |
|---|---|---|
| Fixture/Kit Cost | $2,800 | $4,000 |
| Installation Labor | $1,500 (100h × $15/h) | $4,000 (200h × $20/h) |
| Disposal (old fixtures) | $0 (housing stays) | $300-500 |
| Total Project Cost | $4,300 | $8,300-8,500 |
| Savings with Retrofit | 48% ($4,000+) | |
| Kit Type | DLC Premium Available? | Typical Rebate | Payback (vs no rebate) |
|---|---|---|---|
| 2x4 Troffer Retrofit | ✅ Yes (150+ models) | $8-15/kit | Immediate — rebate covers 30-50% of kit cost |
| HID High Bay Retrofit (150W eq) | ✅ Yes (200+ models) | $10-20/kit | Rebate covers 25-40% of kit cost |
| Linear Strip Retrofit | ✅ Yes (100+ models) | $5-10/kit | Rebate covers 30-40% of kit cost |
| LED Corn Bulb | ⚠️ Few (<20 models) | $2-5/bulb | Minimal — corn bulbs are already cheap |
| Condition | Retrofit | Replace |
|---|---|---|
| Housing in good condition, <15 years old | ✅ | Overkill |
| Housing rusted, bent, or damaged | ❌ | ✅ Replace — unsafe to retrofit into damaged housing |
| Need to change fixture layout/spacing | ❌ | ✅ Retrofitting locks you into existing layout |
| Adding controls (occupancy/daylight sensors) | ✅ (add sensors) | ✅ (integrated sensors) |
| Ceiling renovation planned within 3 years | ✅ | Wait — replace during renovation |
| Historic building / architectural fixture | ✅ | ❌ Preservation requirements |
Find DLC-listed LED retrofit kits from verified wholesale suppliers
Filter by kit type, DLC certification, wattage, and price — 200+ suppliers on Compare2Best.
Compare Retrofit Kits →